STN Drylining undertook the plastering works to 9 luxury units located in Wimbledon Village.
As it was over 1st, 2nd and 3rd floors we needed a 13m boom to get the materials up to the correct levels. There no was space to store materials so ordering the right amount was critical. These 9 x 2 bed flats were desgined to be of a high standard, so it was important the units were handed over snag free.
This was a nice residential scheme to work on with Rhino Construction.